Seslendirme


70 Dilde Yabancı Dil Seslendirme, Televizyon Reklam Filmleri, Kurumsal Tanıtım Filmleri, Radyo Reklam Spotları, Radyo Jingle ve Dj Jingle Servisi, Kapalı Devre Radyo, Mağaza Radyo, Mağaza Anons ve Kesintisiz Muzik Yayıncılık Sistemleri, IVR Seslendirme, Santral Anons ve Santral Seslendirme, Siyasi Parti Reklam ve Secim Kampanyaları.

Seslendirme projeleriniz icin şu alt başlıklarda sizlere hizmet sunmaktayız, Reklam Seslendirme, Santral Seslendirme, Tanıtım Filmi Seslendirme, Mağaza Anons Seslendirme, Haber Seslendirme, Perfore Seslendirme, Jingle Seslendirme, Secim Seslendirme, Yabancı Dil Seslendirme, Animasyon Seslendirme, E-Kitap Seslendirme, DJ Jingle Seslendirme, Tesis Anonsu Seslendirme, Sesli Mesaj Seslendirme, Medikal Seslendirme, Belgesel Seslendirme, Sponsorluk Seslendirme, IVR Seslendirme, Eğitim Filmi Seslendirme, Santral Anons Seslendirme. Temsil etitğimiz ve anlaşmalı olan seslendirme ekibimiz sanatcıları projelerinize hayat vermek icin sizleri bekliyor. En profesyonel yabancı dil seslendirme cozumlerine en uygun fiyatla sahip olmak istiyorsanız bize telefon, email veya canlı destek hattımız aracılığı ile ulaşmanız yeterli olacaktır.

Reklam Seslendirme Çalışmaları Kısa Sürede Teslim Edilir!

Reklam seslendirme çalışmasını gerçekleştirmek isteyen markalar, firmalar veya kişiler akıllarında olan fikirleri ya da yaratıcı bir düşünme sonunda elde ettiği sloganları hemen gerçeğe dönüştürerek bir reklam içinde duymak isterler. Bunun bilincinde olan firmamız en iyi şekilde değerlendirmelerini yapmak için radyo reklam seslendirme ve televizyon reklamlarını seslendirmede çok kısa sürede seslendirme çalışmasını tamamlayarak kayıtların teslim edilmesini sağlamaktadır. Son derece hızlı çıktı alınabilen teknik altyapımız sayesinde reklam seslendirmeye yönelik taleplerin bize gelmesinin ardından bir gün içerisinde seslendirmeyi teslim edebiliyoruz.

Çalışma şekli olarak firmamızın benimsediği yol öncelikle birebir görüşmelerle seslendirme hizmetinden neler beklendiğine yönelik olmaktadır. İki tarafın anlaşmalı şekilde seslendirme projesine ortak olmasından sonra reklamda seslendirilecek olan metinleri talep ediyor ve bir günlük süre içerisinde bu çalışmayı tamamlayarak sizlere dönüt verebiliyoruz. Sürekli olarak kullanılan reklam sloganlarınız veya seslendirme metinlerinizin mevcut olduğu durumlarda elektronik posta yerine sitemizi de kullanarak en hızlı şekilde bizlerle iletişime geçebilirsiniz.

Etkileyici Seslerle Televizyon Reklamlarında İlgi Çekin!

Televizyona yönelik olarak hazırlanan reklam filmleri ve tanıtımlarda daha çok görsel bir zemin üzerine bu reklamların hazırlanması söz konusu olduğu için pek çok kişi ses altyapısının nasıl hazırlanması gerektiğini arka planda bırakarak görsel odaklı bir etkileme yöntemini bulmaya gayret etmektedir. Oysa tv de en az radyo kadar seslendirmenin önemli olduğu bir alandır. Özellikle televizyon izleyicisinin çok farklı yönlerden uyarılarak reklamlardan etkilenmesini sağlamak için mutlaka televizyon reklam seslendirme çalışmalarında da profesyonel destek almak gerekiyor.

Seslendirme

reklam seslendirme

  Articles
Symptoms:

Squealing, smoking. Mine failed once I slowed down to get fuel after a 'brisk" run. I was going cross country and was stranded in Montana but that is another story (see "Field Replacement of Alternator")

This article is about rebuilding the alternator. 

Click on any image to see close-up. When you do so, use your browser "back" button to return.

 \

Tools Required:

1. Rebuild kit 

2. 15/16 in socket

3. digital camera.

4. torque wrench (I'll say right up front here I can't remember the various torque used on each fastener. These can be looked up just based on the size of the hardware)

 Photo

 Photo

Procedure:

Using the 15/16 socket remove the pulley(shown) and the cooling fan and spacer (not shown). Then remove the long bolts holding the shell together.

 Take plenty of your own pictures. Capture the details like which insulating washer goes where.

 Photo
 This is the fried bearing. The groves you see are what's left of the inner race of the bearing.
Photo
Notice the debris in the rotor/stator assembly. Remove and clean this area well.
 Photo
Inspect for debris around the diode assembly.
 Photo
You might find ball bearings too. They can be magnetic and stick in places. Be thorough in your inspection/cleaning.
 Photo
The rear bearing outer race is still stuck in the rear of the assembly. This needs to be extracted.
 Photo
The race can be pounded out from behind by placing a rod into the grove where the ball bearings use to be. If your bearing assembly is in one piece then just pound it out at the inner race. Don't worry about damaging it. It will not be reused.
 Photo
 This is the extracted race.
 Photo
The diode assembly can be checked for forward and reverse bias using a Multimeter. Or you can just replace them with  the new ones in the kit. I left mine in. They were fine.
 Photo
Use a cut-off wheel and chisel to break off the left over inner race. Do not kick the shaft.
 Photo
Cut the bottom of the race off again being careful not to nick the shaft.
 Photo
 Diode pack removed for cleaning and inspection.
 Photo
There are three mounting bolts with two diodes in each. There is a total of 6 diodes.
 Photo
 This is the new diode pack which was not used.
 Photo
 With the diode pack out clean the inside of the rear shell.
 Photo
 Clean out the anode holes.
 Photo
 Clean out the head sinks.
 Photo
 Here are the two halves of the diode assembly all clean.
 Photo
 Now to do the front assembly.
 Photo
 Be prepared. This was the hard part.
 Photo
 Getting at the screws is hard. See the open-end wrench?
 Photo
 One small turn at at time.
 Photo
 OK, finally all three of the little suckers off.
 Photo
 Now use a puller to get the front bearing off.
 Photo
 Be patient. It will come off eventually.
 Photo
 Remove and do NOT lose the spacer.
 Photo
 Remove, clean and straighten the inside plate.
 Photo
 Put in the new front bearing. See it sitting in there?
 Photo
 Tap the bearing into place with a similar size socket.
 Photo
 This is the shaft assembly before cleaning
 Photo
 Note the rust before.......
 Photo
 and no rust after using a wire brush.
 Photo
 The contact points for the brushes before cleaning.....
 Photo
 Now after using an emery cloth on them.
 Photo
 Time to start some reassembly. Put the inside spacer on.
 Photo
 Next put the front shell on.
 Photo
 Put the outside spacer on.
 Photo
 Next put on the cooling fan.
 Photo
 Now another spacer.
 Photo
 and now the pulley.
 Photo
 now the washer.
 Photo
 And the nut.
 Photo
 I did replace the black plastic insulator piece. It was cracked. This is the new one as viewed from the outside.
 Photo
 This is a view of the new black plastic insulator from the inside.
 Photo
 I used a reamer to make sure the diode pack went well over the new black plastic insulator.  Photo

 
 Put the diode pack back in.
 Photo

 Here you can see the diode pack in place. Also note the rear bearing is sitting in position but is NOT mounted yet.That is covered soon. It is mounted to the shaft in the next slide to keep the stress low on the ball bearings.

 Photo
 Now some of the hardware goes in to hold the diode pack.  Photo
 More hardware going back in.
 Photo

 BEFORE INSTALLING THE NEW REAR BEARING take it in your one hand and hold it by the inner race. Now spin the outer race. It should spin freely. Listen for ANY sign of grinding or vibration. My first rebuild kit had a bad bearing in it.

You can now put the bearing on the rear shaft and use a socket to tap it into place. Pick a socket that contacts the inner race only. DO NOT use one at is too big. It should just be big enough to not touch the shaft as you put it down to touch the bearing. This way there is no stress to the ball bearings.

 Photo
 Some of the electronics going in
 Photo
 Now it's in place being held with hardware that has plastic insulators on them.
 Photo
 Here I have the new brush assembly (white plastic) with a small metal pin holding the brushes in. It's attached to the socket assembly (black) but it didn't fit right sooooo
 Photo
 I took it off and placed is side by side with the old brush assembly and moved the new graphite brushes (shown to the right) into the old yellow assembly. Fit perfectly.
 Photo
 Here the old yellow assembly is shown with the new springs before the graphite brushes were installed.
 Photo
 Here is the rebuild brush assembly and black socket reinstalled.
 Photo
 Now put the two shells back together and install the long thin bolts. You're done !!
 Photo
   
   
Expected Result:
Once you have reassembled the unit take it to a cooperating parts store for testing before reinstalling it. You can save time by finding anything wrong before going through all the work of installing it.
 
Related Articles:

 

Other Links:

 






Note melted plastic in the middle


Posted in: Electrical, Engine
Actions: E-mail | Permalink |
  Disclaimer

The information contained in this website is for general information purposes only. Whilst we endeavor to keep the information up-to-date and correct, we make no representations or warranties of any kind, express or implied, about the completeness, accuracy, reliability, suitability or availability with respect to the website or the information, products, services, or related graphics contained on the website for any purpose. Any reliance you place on such information is therefore strictly at your own risk.

In no event will we be liable for any loss or damage including without limitation, indirect or consequential loss or damage, or any loss or damage whatsoever arising from loss of data or profits arising out of or in connection with the use of this website.

Through this website there are links to other websites which are not under the control of the ZR-1 Net Registry. We have no control over the nature, content and availability of those sites. The inclusion of any links does not necessarily imply a recommendation or endorse the views expressed within them.

Read the full Disclaimer...

©2024 ZR-1 NET Registry   |  Privacy Statement